3 phases for correctly installing traction batteries

15 January 2026


Installing an industrial traction battery is a critical task that demands precision and attention to detail. The safety, reliability, and long-term performance of the battery all hinge on this step being carried out correctly. A rushed or improvised job is a direct path to costly mistakes, ranging from avoidable downtime to serious safety hazards. That’s why our Energic Plus experts have laid out the process in a 3-phase, 8-step guide to ensure a safe, correct, and smooth installation every time.

 

Phase 1: Preparation and planning

Phase 1: Preparation and planning

Step 1: Location check. Select a well-ventilated, dry and cool area. It’s crucial to have sufficient working space around the battery for maintenance and servicing.

Step 2: Safety and compliance requirements. Ensure you have all the necessary personal protective equipment (PPE) readily available, including safety goggles and gloves. You should also have the appropriate fire-extinguishing equipment for the type of battery you’re working with, as well as an emergency plan. For lead-acid batteries, for example, it is recommended to have an eye-wash bottle at hand. Check the local laws and regulations that apply to the charging area or warehouse.

Step 3: Tools and materials. Gather all the necessary tools (make sure they are insulated), cables, connectors, fluids (demineralised water, if required) and measuring equipment (multimeter and hydrometer).

Phase 2: Placement

Phase 2: Placement

Step 4: Placement of the battery. As a traction battery can be quite heavy, use certified lifting equipment, such as a forklift with lifting straps, or battery changing beams designed specifically for this purpose, to place the battery in its designated location. Place the battery on a suitable surface or raise it if necessary.

Step 5: Installation of peripheral equipment. Install the charger close to the battery and ensure that it is correctly earthed. Check that the charger is compatible with the type and capacity of the battery.

Phase 3: Connection and startup

Phase 3: Connection and startup

Step 6: Cabling and connection. Connect the battery to the charger and the mains supply using the correct cables. Use a multimeter to check the polarity (positive to positive and negative to negative) before making the final connection. Make sure that all connections are secure and free from corrosion.

Step 7: First check and commissioning. Perform a visual inspection to check for any damage, leaks or loose connections. Switch on the power and start the charger according to the manufacturer's instructions. If present, perform the initial configuration of the Battery Management System (BMS).

Step 8: First full charge cycle. It’s crucial that the first full charge cycle is completed correctly, as this will affect the battery’s service life. Allow the battery to charge fully without interruption. For lead-acid batteries, check the electrolyte level after charging and only top up with demineralised water after approximately 10 cycles at the start, if necessary. Thereafter, check the water level weekly after charging.

Find out even more about Energic Plus

Read some of our other blogs to find out more about industrial batteries, chargers, and advanced battery maintenance solutions from Energic Plus:

  • How to charge traction batteries correctly
  • How to discharge lead-acid batteries
  • How to choose the right high-quality battery charger
  • Things you should know before using a battery charger
  • Why machines should not be used while charging
  • Why a high-frequency charger is the better choice
  • How to choose between a built-in and a stand-alone charger
  • Save batteries with the Energic Plus battery regenerator
  • 5 tips to maintain a starter battery
  • How to maintain lead-acid batteries
  • How to install block batteries correctly and safely
  • Maximise the lifespan of block batteries with regular maintenance
  • How maintenance extends the life of traction batteries


Looking for Energic Plus power solutions?

  • Click here for more info about Energic Plus.
  • Visit our online shop to order power solutions.
  • Please don’t hesitate to contact us if you have any questions.


About the authors

This blog post is brought to you by your Energic Plus team.

Request your customer account to shop parts online

STEP 1
Tell us about your company

Submit the application form to specify your business needs and request your customer account.

STEP 2
Your account creation

Our sales team will contact you within 3 business days to talk about your business needs and complete registration.

STEP 3
Access our online shop

After your account is set up, you will receive a personal login to our online shop. We will guide you in finding parts and placing your first order.

Request your account

Over 75.000 customers trust TVH as their spare parts supplier to ensure their client’s equipment fleet is running smoothly and efficiently. It starts with a customer account.

Become a customer